Plant Movement & Industrial machinery Installation in City of London
Simmons Industrial Services is a well-established Plant movement and Machinery installation/removal company, and delivers a safe and practical solution to all of your machinery and heavy equipment moving requirements in the City of London area.
From our base in Croydon on the London/Surrey border our teams operate anywhere in the European Union.
Where standard solutions do not exist, we offer a bespoke service with full project management when required.
We pride ourselves that our plant movement and machinery installation teams comprise experienced, dedicated, and highly motivated individuals that excel as team players. Our teams have a ‘can-do’ attitude, whilst always maintaining their awareness of safety issues.
We carry a large inventory of new heavy load moving equipment, which provides protection from injury to our operatives and also allows for a speedier, higher quality service for our customers.
Irrespective of the size, shape or fragility of your plant, we deliver this service throughout City of London, Greater London, the rest of the UK and Europe.
Typical of the heavy equipment we move, offload and position are:
- Generators
- CHP
- Gas turbines
- MRI scanners
- ROV (mini-subs)
- UPS (Battery and Rotary)
- Chillers
- AHU’s
- LV/HV Switchboards
- Transformers
- Drilling and Milling machines
- Cannons and other weaponry
- Engineering equipment
- Radar installations
- Boilers
Other types of equipment we move, lift and position include:
- Artwork
- Statues
- Safes
- Marble
- In fact, anything heavy or fragile
We also undertake plant dismantling and disposal.
Over the past 25 years we have gained a considerable reputation for the professional approach we take to the refurbishment of Data Centres. Each Data Centre project is assigned a manager who oversees productivity and safety. We use approved waste streams and ensure that all equipment is recycled where possible in line with our ambition to continually reduce waste to landfill. We liaise with the client to ensure that safe systems of work exist both from the client side and Simmons side and we ensure these systems are effectively communicated and managed. Each project is overseen by our Policy Director a Graduate member of IOSH and Full Member of the Institute of Industrial Accident Investigators; with considerable practical experience in the consulting and advisory capacity.
Transportation and Storage City of London, Greater London
We can arrange for the safe, dry storage of your materials and machinery at our own secure premises in Croydon, Surrey or from our depots in Belvedere and Erith, Kent. We run a fleet of delivery vehicles including lorry loaders and are registered with the Fleet Operators Recognition Scheme operating in London.
Read our case studies to see us in action:
Plant Movement Case Studies
Call us now on 020 8688 3553 or use our contact form to
get a plant movement quote
Examples of our plant movement work in City of London:
Vital – Kidbrooke, South London
This particular part of the project was to offload and position all the plant required for the District Heating Scheme Energy Centre comprising of thermal stores, CHP’s and boilers. The plantroom floor was 3m below ground level and all plant had to be posted and lowered through a small opening. In addition to this type of plant we also transported, offloaded and positioned electrical equipment such as transformers and switchgear.
Onsite modification required on risers at Kings Cross
Shepherd Engineering Services, London - The photos depict us lifting into place 54 sections of modular riser and fixing them through the floors and into their final position. Some of the risers had to be modified by our fabrication team on site after acquiring approval from the manufacturer and client, to allow them to be lifted and fixed safely.
Successful negotiations with Transport for London on simple lift
Cuffe (Southwark) - This work only involved lifting steelwork up to the roof so that a further two floors could be built. This was a simple job however complicated by the fact that the work was in Borough High Street required temporary traffic lights and conflicted with 4 other road closures. Due to this we spent about 8 weeks meeting with TFL and the other parties to combine our efforts to reduce the local impact. TFL's demands did effect the programme however we were able to negotiate reduced fees which went someway to compensating the client.