Skip to main content
Plant & Machinery Installation

Plant & Machinery Installation City of London

Plant and machinery installation, equipment relocation and careful positioning services for clients in City of London, London and surrounding areas.

What We Do

Plant & Machinery Installation in City of London

Simmons Industrial provides plant and machinery installation services to clients in City of London and across London. From offloading and positioning to factory setup and equipment relocation, our team plans each move with full method statements and risk assessments.

Offloading and positioning of heavy plant equipment
Plant and machinery installation in live environments
Factory setup, equipment relocation and reconfiguration
Rigging, skidding and alignment support
Crane hire and contract lifting for complex installations
Full method statements and risk assessments for every project

Coverage Area

We operate throughout London with plant and machinery installation teams covering City of London and surrounding areas. Our services include offloading, positioning, relocation and planned setup for industrial and commercial clients.

Plant InstallationEquipment RelocationCareful PositioningFactory SetupCrane-Supported MovesRisk Assessments

Safety & Compliance

Every plant and machinery installation is planned with method statements, risk assessments and lifting plans where required.

CHASSafeContractorCPA Contract LiftLOLER-aware PlanningCITB Certificated Crane Team

Industrial plant movement and removal

From our base in Croydon on the London/Surrey border, Simmons' own team handles plant movement, machinery installation and removal across the UK and mainland Europe. Where a standard handling solution is not suitable, we plan a bespoke approach with project management to match the work.

Equipment we move, offload and position includes generators, CHP units, gas turbines, MRI scanners, UPS equipment, chillers, air handling units, switchboards, transformers, boilers and engineering machinery. We also handle heavy or fragile items and undertake plant dismantling and disposal.

Data-centre refurbishment and plant replacement require coordination of safety, productivity and access. We liaise with the client on safe systems of work, arrange appropriate handling equipment and consider reuse or recycling through approved waste streams where possible.

London project experience

At Vital in Kidbrooke, South London, we offloaded and positioned thermal stores, CHP units and boilers through a restricted opening into a plant room three metres below ground. Electrical equipment included transformers and switchgear.

At Grosvenor Crescent, a 500-tonne crane was selected to dismantle and lift down two cooling towers over consecutive weekends. At Kings Cross, our team lifted and fixed 54 modular riser sections, with onsite modifications agreed with the manufacturer and client.

For a steelwork lift in Borough High Street, Southwark, the work required temporary traffic lights and coordination with other road closures. Planning with Transport for London helped manage the impact and the programme.

Ready to Install Your Plant?

Request a project review and quote for plant and machinery installation in City of London. Our team is ready to plan your installation safely and efficiently.

Looking for our full plant and machinery installation service? View our Plant & Machinery Installation service page