Dismantling and lifting down two cooling towers over two consecutive weekends using a 500te crane.

Optimum Group - Grosvenor Crescent

Verified Scope Notes

The scope was to dismantle and lift down two cooling towers.
The work took place on two consecutive weekends.
Simmons used a 500te crane with fixed fly to achieve the required radius.

Project Info

Named client

Optimum Group

Location

Grosvenor Crescent W1, London

Service

Crane Hire & Contract Lifting

Evidence

Legacy /case-studies page: Optimum Group - 500te crane in Grosvenor Crescent W1, London. Commercial results, dates, durations and client permissions need business sign-off before publication.

Have a New Project?

Request a project review and quote. Our team is ready to help with your next industrial challenge — from single lifts to complete turnkey solutions.

Call or send project details for the team to review

Analytics cookies

We load Google Analytics only if you accept. Reject leaves this browser without analytics cookies. Both choices are saved on this device.