Grosvenor Crescent W1, London
Optimum Group - Grosvenor Crescent
Dismantling and lifting down two cooling towers over two consecutive weekends using a 500te crane.

Verified Scope Notes
The scope was to dismantle and lift down two cooling towers.
The work took place on two consecutive weekends.
Simmons used a 500te crane with fixed fly to achieve the required radius.